Case studies

38 project examples.

Typical hotel projects in our markets and how we would fit them out, from brief to handover. Each example shows what we can do for a hotel of that kind. Key counts, room mixes and timelines are planning assumptions.

Our capabilities

What we can deliver for a hotel like yours.

Twenty-one hotel types in our markets and what we can deliver for each: room mix, scope, working model, timeline and the design targets behind it. These are capability showcases, not completed projects.

Boutique hotel, Sliema
SliemaMalta

Boutique hotel

A 48-key boutique hotel in a row of joined limestone townhouses.

Heritage conversion, Valletta
VallettaMalta

Heritage conversion

A 26-key hotel in a listed palazzo with vaulted ground floor rooms.

Business hotel, Berlin
BerlinGermany

Business hotel

A 210-key business hotel in a 1990s block, refurbished while open.

City hotel, Hamburg
HamburgGermany

City hotel

A 120-key city hotel in a former brick office building.

Aparthotel, Amsterdam
AmsterdamNetherlands

Aparthotel

A 34-unit aparthotel across three joined canal houses.

Budget-smart hotel, Rotterdam
RotterdamNetherlands

Budget-smart hotel

A 180-key budget-smart new build with compact rooms.

City hotel, Copenhagen
CopenhagenDenmark

City hotel

A 92-key city hotel in a 1930s brick building.

Business hotel, Warsaw
WarsawPoland

Business hotel

A 150-key business hotel in a converted 1970s concrete block.

Heritage conversion, Bucharest
BucharestRomania

Heritage conversion

A 40-key boutique hotel in a restored early 20th century villa.

Resort interiors, Muscat
MuscatOman

Resort interiors

Interiors for a 160-key resort with a spa and three restaurants.

City hotel, Doha
DohaQatar

City hotel

A 260-key city hotel on the upper floors of a new tower.

Boutique hotel, Istanbul
IstanbulTürkiye

Boutique hotel

A 30-key boutique hotel in a restored stone han around a courtyard.

Heritage conversion, Nevşehir
NevşehirTürkiye

Heritage conversion

A 22-key hotel in carved stone houses with cave rooms.

Wellness hotel, Budapest
BudapestHungary

Wellness hotel

An 85-key wellness hotel with a thermal spa in an old bath building.

Boutique hotel, Valletta
VallettaMalta

Boutique hotel

An 18-key boutique hotel above a street of shops, with new walnut corridors.

Airport hotel, Frankfurt
FrankfurtGermany

Airport hotel

A 240-key airport hotel with soundproofed rooms and a 24-hour lobby.

Select-service hotel, Cologne
CologneGermany

Select-service hotel

A 140-key select-service hotel where lobby, bar and breakfast are one room.

School-to-hotel conversion, Utrecht
UtrechtNetherlands

School-to-hotel conversion

A 64-key hotel in a former school, with mezzanine rooms in the old classrooms.

Office-to-hotel conversion, Aarhus
AarhusDenmark

Office-to-hotel conversion

A 1970s office block turned into a 118-key hotel.

Aparthotel, Prague
PragueCzechia

Aparthotel

A 46-unit aparthotel in a tenement from around 1900, around an open gallery corridor.

Select-service hotel, Riyadh
RiyadhSaudi Arabia

Select-service hotel

A 190-key select-service business hotel with a majlis-style lobby.

All capabilities

We turn your ideas into a real experience.

Seafront hotel refreshProject example
Malta · Refurbishment of an existing seafront resort hotel

Seafront hotel refresh

An existing three-star seafront hotel wants to reposition as a calm, design-led four-star without closing for a full sea…

Townhouse conversionProject example
Malta · Conversion of a historic townhouse into a boutique hotel

Townhouse conversion

A protected townhouse with a courtyard and timber balconies becomes a 22-key boutique hotel. Nothing can be fixed to his…

Business hotel room roll-outProject example
Germany · Room renovation in an operating city business hotel

Business hotel room roll-out

A 180-key business hotel needs a room refresh: better desks, better sleep, quicker housekeeping. Rooms must be renovated…

Harbour design hotelProject example
Germany · New-build design hotel in a port district

Harbour design hotel

A new design hotel near the harbour wants rooms and public areas that feel like the waterfront: steel, oak, rope and bri…

Canal-side aparthotelProject example
Netherlands · Conversion of narrow canal-side buildings into an aparthotel

Canal-side aparthotel

Three narrow buildings become one aparthotel for longer stays. Every centimetre counts: built-in storage, compact kitche…

Silence-led city hotelProject example
Denmark · New-build city hotel with a sleep and silence focus

Silence-led city hotel

A city hotel built around sleep: acoustic headboard walls, blackout, soft materials and a Nordic sauna instead of a larg…

Airport hotel refreshProject example
Germany · Refurbishment of an airport hotel lobby and rooms

Airport hotel refresh

An airport hotel with 220 keys needs a faster lobby, compact rooms that sleep well and a breakfast that opens before the…

Wellness retreatProject example
Malta · New-build wellness retreat on a rural site

Wellness retreat

A small retreat for wellness programmes: treatment rooms, a health centre, hydrotherapy and healthy dining. Rooms must f…

Family resortProject example
Eastern Europe · Refurbishment of a family resort on the Black Sea coast

Family resort

A large family resort wants to renew its restaurant and family rooms, add a proper kids’ club and give teenagers a reaso…

High-end city flagshipProject example
Middle East · New-build high-end city hotel

High-end city flagship

A high-end city hotel needs a grand lobby, a hammam-led spa, signature suites and a winter rooftop that works in the coo…

Heritage city hotel refreshProject example
Eastern Europe · Refurbishment of a hotel in a 1900s building near the thermal baths

Heritage city hotel refresh

A tired four-star in a protected building wants to reconnect with the city's bath-house heritage. Rooms still have 1980s…

Belle Époque boutique conversionProject example
Eastern Europe · Conversion of an interwar apartment building into a boutique hotel

Belle Époque boutique conversion

An investor owns an apartment building with original plaster mouldings and tall windows. The rooms are large but oddly s…

Business hotel in a 1970s blockProject example
Eastern Europe · Deep refurbishment of a 1970s concrete hotel

Business hotel in a 1970s block

A state-era hotel near the business district has the right location and the wrong rooms: narrow single beds, linoleum an…

City flagship refreshProject example
Middle East · Refurbishment of an early-2000s high-end hotel

City flagship refresh

A high-end hotel with a bay view looks dated next to newer competitors: glossy dark veneer, gold satin and bulky TV cabi…

Coastal resort repositioningProject example
Middle East · Refurbishment of a 1990s beach resort

Coastal resort repositioning

A beach resort with a fine location has faded rattan, cracked tiles and no spa. The owner wants an Omani-rooted wellness…

Office to aparthotel conversionProject example
Netherlands · Conversion of a 1990s office building near the port

Office to aparthotel conversion

An empty office building with deep floor plates and good transport links becomes an aparthotel for long and short stays.…

Apartment block to business hotelProject example
Malta · Conversion of a 1980s apartment block into a business hotel

Apartment block to business hotel

A family-owned apartment block becomes a business hotel for people who come to Malta to work. Rooms are long and narrow,…

Printworks boutique hotelProject example
Germany · Conversion of a listed industrial building into a boutique hotel

Printworks boutique hotel

A former printworks with high ceilings and steel columns becomes a boutique hotel. The structure stays visible, so every…

Trade-fair hotel refreshProject example
Germany · Refurbishment of a hotel that fills up during trade fairs

Trade-fair hotel refresh

A hotel near a trade-fair ground is full for fair weeks and quiet in between. Rooms need to sleep two colleagues well, m…

Office to long-stay studiosProject example
Netherlands · Conversion of a 1990s office building near a railway station

Office to long-stay studios

An empty office building becomes long-stay studios for project workers and people between homes. Each studio needs a kit…

Family city hotelProject example
Netherlands · New-build city hotel for families and groups

Family city hotel

A new city hotel for families who visit museums, zoos and events. Rooms sleep four without feeling crowded, and the publ…

Warehouse hygge hotelProject example
Denmark · Conversion of a brick warehouse into a city hotel

Warehouse hygge hotel

A brick warehouse becomes a hotel built around hygge: warm light, wool, oak and places to sit together. Thick walls and …

Sleep-first budget hotelProject example
Denmark · New-build budget hotel with compact rooms

Sleep-first budget hotel

A budget hotel where every euro goes into sleep: compact rooms, very good beds, blackout and acoustic headboards, and a …

Airport transit hotelProject example
Eastern Europe · New-build hotel next to an airport terminal

Airport transit hotel

A transit hotel for early flights, late arrivals and short business trips. Guests stay one night or a few hours. Everyth…

1930s functionalist hotel refreshProject example
Eastern Europe · Refurbishment of a 1930s functionalist hotel

1930s functionalist hotel refresh

A functionalist hotel from the 1930s keeps its staircase, windows and lobby, but rooms and furniture need renewing. The …

Majlis suites hotelProject example
Middle East · New-build hotel with family suites

Majlis suites hotel

A new hotel for families and long visits, with suites that have a majlis-style sitting area separate from the bedroom, a…

Work-live loft hotelProject example
Netherlands · Conversion of an office building into long-stay lofts

Work-live loft hotel

An office building with high floors becomes a loft hotel for people who stay for weeks: consultants, researchers and peo…

Brewery breakfast hotelProject example
Denmark · Conversion of an old brewery building into a city hotel

Brewery breakfast hotel

An old brewery building becomes a city hotel where breakfast is the main event. The raw brick stays, a long breakfast ha…

Bathhouse wellness hotelProject example
Germany · Conversion of a listed public bathhouse into a hotel

Bathhouse wellness hotel

A listed public bathhouse becomes a quiet hotel built around its old pool hall. The hall is restored for swimming and ev…

Lean luxury city hotelProject example
Netherlands · New-build compact city hotel

Lean luxury city hotel

A new city hotel that cuts what guests do not use and invests in what they do. No wardrobe doors, no minibar, no restaur…

Vaulted suites in a bastionProject example
Malta · Conversion of fortification vaults into a suite hotel

Vaulted suites in a bastion

Stone vaults in an old fortification become suites. The vaults are tall enough for a sleeping mezzanine over the bathroo…

Palazzo suite collectionsProject example
Malta · Conversion of a 17th-century palazzo into a suite hotel

Palazzo suite collections

A city palazzo becomes a suite hotel where the suites are grouped into small collections, each with its own story, colou…

Kontor long-stay studiosProject example
Germany · Conversion of a 1950s office building into studios

Kontor long-stay studios

A 1950s office building becomes a studio hotel that feels like a well-kept apartment from the same era. Larger studios g…

Smart business hotelProject example
Denmark · New-build business hotel near a city square

Smart business hotel

A business hotel with compact smart rooms and one big ground floor that works as lobby, workplace, canteen and bar. Gues…

Midscale smart hotelProject example
Middle East · New-build midscale city hotel

Midscale smart hotel

A midscale city hotel for young business travellers and families. Rooms store luggage under the bed, a self-service laun…

Courtyard house hotelProject example
Middle East · Restoration of traditional courtyard houses into a hotel

Courtyard house hotel

A group of traditional courtyard houses becomes a quiet heritage hotel. Rooms open to shaded courtyards, a majlis lounge…

Grand library hotelProject example
Eastern Europe · Full refurbishment of a 19th-century grand hotel

Grand library hotel

A grand hotel in a historic city centre is refurbished with blackened oak, marble and a reading corner in every suite. T…

Family play fort hotelProject example
Denmark · New-build family hotel near a leisure park

Family play fort hotel

A family hotel where every room has a play fort for the children: bunks, a little door and round windows, with storage b…

Project example 01 · Malta · Refurbishment of an existing seafront resort hotel

Seafront hotel refresh

A 96-key hotel in Malta: how we would fit it out.

Brief

An existing three-star seafront hotel wants to reposition as a calm, design-led four-star without closing for a full season. Rooms are dated, the breakfast room is too small at peak and the roof is unused.

Mood

PeacefulHealthyRoom concept: Maltese Limestone

FF&E scope

Full guest-room FF&E (headboard walls, wardrobes, desks, vanities, loose furniture), breakfast conservatory, roof bar furniture, pool deck loungers, lobby joinery.

BeforeBefore · existing condition (visualisation)
AfterAfter · Maltese Limestone

Room mix · 96 keys (illustrative assumption)

LayoutShareKeys
Comfort · 30.0 m²35%≈ 34
Comfort Corner · 30.0 m²10%≈ 10
Superior Wellness · 40.0 m²25%≈ 24
Superior Bath · 40.0 m²20%≈ 19
Junior Suite Open Bath · 50.0 m²10%≈ 10

Process & timeline · 36 weeks (illustrative assumption)

Brief, survey, concept
4 wk
Drawings, samples
6 wk
Mock-up room, approval
4 wk
Production in our factory
10 wk
Phased install, 2 floors at a time
12 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Phasing two floors at a time keeps most rooms sellable during the works. The conservatory adds breakfast seats where the peak queue was, the roof bar opens a new revenue point for guests and non-residents, and corner and wellness rooms create upsell categories that did not exist before.

Project example 02 · Malta · Conversion of a historic townhouse into a boutique hotel

Townhouse conversion

A 22-key hotel in Malta: how we would fit it out.

Brief

A protected townhouse with a courtyard and timber balconies becomes a 22-key boutique hotel. Nothing can be fixed to historic walls without approval, so furniture must stand free or fix to new linings.

Mood

CalmJoyfulRoom concept: Valletta Gallarija

FF&E scope

Free-standing joinery (headboards, wardrobes on plinths), wall linings with service voids, library bar, courtyard furniture.

New build / conversion: the starting point is a bare shell
Before · shell
AfterAfter · Valletta Gallarija

Room mix · 22 keys (illustrative assumption)

LayoutShareKeys
Smart · 20.1 m²20%≈ 4
Comfort · 30.0 m²35%≈ 8
Comfort Corner · 30.0 m²20%≈ 4
Junior Suite · 50.0 m²15%≈ 3
Suite · 60.0 m²10%≈ 2

Process & timeline · 38 weeks (illustrative assumption)

Survey, heritage constraints
6 wk
Concept, samples
6 wk
Shop drawings and approvals
8 wk
Production
10 wk
Install
8 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Small boutique hotels earn their rate on character. Free-standing joinery protects the building and keeps future changes simple, and a library bar gives the hotel an evening offer without a full restaurant.

Project example 03 · Germany · Room renovation in an operating city business hotel

Business hotel room roll-out

A 180-key hotel in Germany: how we would fit it out.

Brief

A 180-key business hotel needs a room refresh: better desks, better sleep, quicker housekeeping. Rooms must be renovated in batches while the hotel stays open.

Mood

MotivatingCalmRoom concept: Berlin Concrete

FF&E scope

Guest-room FF&E for 180 keys in batches, grab-and-go breakfast fit-out, divisible meeting hall furniture, gym joinery, co-working lounge.

BeforeBefore · existing condition (visualisation)
AfterAfter · Berlin Concrete

Room mix · 180 keys (illustrative assumption)

LayoutShareKeys
Smart Work · 20.1 m²30%≈ 54
Smart Twin · 20.1 m²10%≈ 18
Comfort · 30.0 m²30%≈ 54
Comfort Connecting · 30.0 m²10%≈ 18
Superior Work · 40.0 m²15%≈ 27
Smart Accessible · 24.8 m²5%≈ 9

Process & timeline · 43 weeks (illustrative assumption)

Brief, room audit
3 wk
Concept, mock-up room
6 wk
Pilot batch of 10 rooms
4 wk
Series production
14 wk
Install in batches of 20 rooms
16 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Business guests choose on desk, sleep and speed. A long work desk and acoustic headboard target review scores, the divisible hall can be sold as one or two rooms, and grab-and-go breakfast serves early departures who otherwise skip breakfast.

Project example 04 · Germany · New-build design hotel in a port district

Harbour design hotel

A 140-key hotel in Germany: how we would fit it out.

Brief

A new design hotel near the harbour wants rooms and public areas that feel like the waterfront: steel, oak, rope and brick, without becoming a theme park.

Mood

EnergeticCalmRoom concept: Hamburg Harbour

FF&E scope

Full FF&E and joinery for rooms, long steel-and-oak bar, Bauhaus dining hall, library lobby.

New build / conversion: the starting point is a bare shell
Before · shell
AfterAfter · Hamburg Harbour

Room mix · 140 keys (illustrative assumption)

LayoutShareKeys
Smart · 20.1 m²25%≈ 35
Comfort · 30.0 m²35%≈ 49
Comfort Open Bath · 30.0 m²15%≈ 21
Superior · 40.0 m²15%≈ 21
Junior Suite Corner · 50.0 m²10%≈ 14

Process & timeline · 44 weeks (illustrative assumption)

Concept, design development
8 wk
Shop drawings, samples
8 wk
Mock-up room
4 wk
Production
12 wk
Install floor by floor
12 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

A bar that locals choose is revenue on nights when occupancy is low. Open-bath rooms sell as a distinct category, and a dining hall layout with long tables keeps covers high with fewer staff.

Project example 05 · Netherlands · Conversion of narrow canal-side buildings into an aparthotel

Canal-side aparthotel

A 48-key hotel in the Netherlands: how we would fit it out.

Brief

Three narrow buildings become one aparthotel for longer stays. Every centimetre counts: built-in storage, compact kitchens and a co-working café on the ground floor.

Mood

JoyfulMotivatingRoom concept: Canal House

FF&E scope

Built-in joinery with kitchenettes (appliances by others), compact wardrobes, co-working café, bakery breakfast counter.

BeforeBefore · existing condition (visualisation)
AfterAfter · Canal House

Room mix · 48 keys (illustrative assumption)

LayoutShareKeys
Smart · 20.1 m²30%≈ 14
Comfort · 30.0 m²40%≈ 19
Superior · 40.0 m²20%≈ 10
Family Suite Connecting · 70.0 m²10%≈ 5

Process & timeline · 36 weeks (illustrative assumption)

Survey of three buildings
4 wk
Concept, space planning
6 wk
Drawings, samples
6 wk
Production
10 wk
Install
10 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Longer stays need storage and a place to work. A café that sells coffee to the street during the day earns from non-residents, and connecting family units let the operator sell larger groups without dedicated big rooms.

Project example 06 · Denmark · New-build city hotel with a sleep and silence focus

Silence-led city hotel

A 120-key hotel in Denmark: how we would fit it out.

Brief

A city hotel built around sleep: acoustic headboard walls, blackout, soft materials and a Nordic sauna instead of a large spa.

Mood

PeacefulCalmRoom concept: Copenhagen Modern

FF&E scope

Acoustic upholstered headboard walls, wardrobes and desks with soft-close hardware, sauna benches and loungers, Nordic living-room lobby.

New build / conversion: the starting point is a bare shell
Before · shell
AfterAfter · Copenhagen Modern

Room mix · 120 keys (illustrative assumption)

LayoutShareKeys
Smart · 20.1 m²20%≈ 24
Comfort · 30.0 m²40%≈ 48
Superior · 40.0 m²25%≈ 30
Junior Suite · 50.0 m²10%≈ 12
Suite Corner · 60.0 m²5%≈ 6

Process & timeline · 34 weeks (illustrative assumption)

Concept, acoustic brief with consultant
6 wk
Samples, mock-up room
6 wk
Production
12 wk
Install
10 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Quiet rooms support a premium positioning and better sleep reviews. A compact sauna and plunge deliver a wellness story without the cost and space of a full spa.

Project example 07 · Germany · Refurbishment of an airport hotel lobby and rooms

Airport hotel refresh

A 220-key hotel in Germany: how we would fit it out.

Brief

An airport hotel with 220 keys needs a faster lobby, compact rooms that sleep well and a breakfast that opens before the first flight.

Mood

MotivatingEnergeticRoom concept: Focus Pod

FF&E scope

Robust compact-room FF&E, self-service-friendly lobby joinery, grab-and-go counter, gym joinery, quiet focus library.

BeforeBefore · existing condition (visualisation)
AfterAfter · Focus Pod

Room mix · 220 keys (illustrative assumption)

LayoutShareKeys
Smart · 20.1 m²45%≈ 99
Smart Twin · 20.1 m²20%≈ 44
Smart Work · 20.1 m²20%≈ 44
Comfort · 30.0 m²10%≈ 22
Smart Accessible · 24.8 m²5%≈ 11

Process & timeline · 39 weeks (illustrative assumption)

Brief, flow study
3 wk
Concept, mock-up
6 wk
Production in batches
14 wk
Night-time and batch installation
16 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

At an airport, speed is value. A grab-and-go counter serves guests at 4 a.m., a focus library sells day passes to transit passengers where the operator chooses, and robust finishes lower replacement over the room life.

Project example 08 · Malta · New-build wellness retreat on a rural site

Wellness retreat

A 60-key hotel in Malta: how we would fit it out.

Brief

A small retreat for wellness programmes: treatment rooms, a health centre, hydrotherapy and healthy dining. Rooms must feel like part of the programme.

Mood

HealthyPeacefulRoom concept: Wellness Retreat

FF&E scope

Wellness rooms with freestanding tubs and yoga corners, treatment and consultation room joinery, recovery lounge, bistro restaurant.

New build / conversion: the starting point is a bare shell
Before · shell
AfterAfter · Wellness Retreat

Room mix · 60 keys (illustrative assumption)

LayoutShareKeys
Superior Wellness · 40.0 m²40%≈ 24
Junior Suite · 50.0 m²30%≈ 18
Junior Suite Open Bath · 50.0 m²20%≈ 12
Signature Wellness · 90.0 m²10%≈ 6

Process & timeline · 40 weeks (illustrative assumption)

Programme brief with operator
6 wk
Concept, samples
8 wk
Mock-up room and treatment room
6 wk
Production
10 wk
Install
10 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Programme-led hotels sell packages, not nights. Treatment rooms, consultations and hydrotherapy create revenue per guest per day, and wellness rooms reinforce the programme so guests stay longer.

Project example 09 · Eastern Europe · Refurbishment of a family resort on the Black Sea coast

Family resort

A 260-key hotel in Eastern Europe: how we would fit it out.

Brief

A large family resort wants to renew its restaurant and family rooms, add a proper kids’ club and give teenagers a reason to stay at the hotel.

Mood

JoyfulEnergeticRoom concept: Family Nest

FF&E scope

Family-suite joinery with bunk niches, robust loose furniture, kids’ club, teen lounge, pool cabanas, bistro restaurant.

BeforeBefore · existing condition (visualisation)
AfterAfter · Family Nest

Room mix · 260 keys (illustrative assumption)

LayoutShareKeys
Comfort · 30.0 m²20%≈ 52
Comfort Connecting · 30.0 m²20%≈ 52
Junior Suite Twin · 50.0 m²15%≈ 39
Family Suite · 70.0 m²30%≈ 78
Family Suite Twin Parents · 70.0 m²15%≈ 39

Process & timeline · 42 weeks (illustrative assumption)

Brief, guest research with operator
4 wk
Concept, samples
6 wk
Mock-up family suite
4 wk
Production
14 wk
Install between seasons
14 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Families return to resorts where every age is looked after. Cabanas are a paid upgrade at the pool, and connecting rooms and family suites capture large groups who would otherwise book two hotels.

Project example 10 · Middle East · New-build high-end city hotel

High-end city flagship

A 240-key hotel in the Middle East: how we would fit it out.

Brief

A high-end city hotel needs a grand lobby, a hammam-led spa, signature suites and a winter rooftop that works in the cooler months.

Mood

CalmJoyfulRoom concept: Gulf Marble Luxe

FF&E scope

Full FF&E for rooms and suites, grand lobby desks and seating, hammam joinery, deco cocktail bar, boardroom, rooftop pavilion furniture.

New build / conversion: the starting point is a bare shell
Before · shell
AfterAfter · Gulf Marble Luxe

Room mix · 240 keys (illustrative assumption)

LayoutShareKeys
Superior · 40.0 m²30%≈ 72
Junior Suite · 50.0 m²25%≈ 60
Junior Suite Corner · 50.0 m²10%≈ 24
Executive Suite · 60.0 m²15%≈ 36
Suite Connecting · 60.0 m²10%≈ 24
Signature Corner · 90.0 m²5%≈ 12
Signature Connecting · 90.0 m²5%≈ 12

Process & timeline · 58 weeks (illustrative assumption)

Concept with interior designer
10 wk
Design development, samples
10 wk
Mock-up suite
6 wk
Production
16 wk
Install
16 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

High-end hotels earn on signature spaces. Executive and connecting suites sell to delegations and families, the boardroom and bar attract local business, and the hammam gives the spa a distinctive offer.

Project example 11 · Eastern Europe · Refurbishment of a hotel in a 1900s building near the thermal baths

Heritage city hotel refresh

A 84-key hotel in Eastern Europe: how we would fit it out.

Brief

A tired four-star in a protected building wants to reconnect with the city's bath-house heritage. Rooms still have 1980s veneer furniture and floral curtains, and guests ask for wellness that the hotel does not offer.

Mood

CalmHealthyRoom concept: Budapest Thermal

FF&E scope

Guest-room FF&E with glazed-tile headboard walls, free-standing wardrobes on plinths, vanities, curtains and loose furniture, a compact sauna and plunge suite, library lobby joinery.

BeforeBefore · existing condition (visualisation)
AfterAfter · Budapest Thermal

Room mix · 84 keys (illustrative assumption)

LayoutShareKeys
Comfort · 30.0 m²30%≈ 25
Comfort Sleep · 30.0 m²15%≈ 13
Superior · 40.0 m²25%≈ 21
Superior Wellness · 40.0 m²20%≈ 17
Junior Suite Open Bath · 50.0 m²10%≈ 8

Process & timeline · 37 weeks (illustrative assumption)

Survey, heritage constraints
5 wk
Concept, tile and brass samples
6 wk
Mock-up room, approval
4 wk
Production in our factory
10 wk
Install, one floor at a time
12 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

The building already tells a story about water. Wellness rooms and a small sauna suite give the hotel a reason to charge more than its neighbours, and sleep rooms on the courtyard side sell to business guests who need quiet.

Project example 12 · Eastern Europe · Conversion of an interwar apartment building into a boutique hotel

Belle Époque boutique conversion

A 38-key hotel in Eastern Europe: how we would fit it out.

Brief

An investor owns an apartment building with original plaster mouldings and tall windows. The rooms are large but oddly shaped, and the brief is a boutique hotel with character that does not look like a chain.

Mood

JoyfulCalmRoom concept: Bucharest Belle Époque

FF&E scope

Free-standing headboards and wardrobes that leave the mouldings untouched, upholstered beds, desks, curtains, lobby and bar joinery, breakfast room furniture.

BeforeBefore · existing condition (visualisation)
AfterAfter · Bucharest Belle Époque

Room mix · 38 keys (illustrative assumption)

LayoutShareKeys
Comfort · 30.0 m²25%≈ 10
Superior · 40.0 m²30%≈ 11
Superior Ladies Floor · 40.0 m²10%≈ 4
Junior Suite · 50.0 m²20%≈ 8
Suite Corner · 60.0 m²15%≈ 6

Process & timeline · 35 weeks (illustrative assumption)

Survey and measured drawings
5 wk
Concept, colour and fabric samples
6 wk
Shop drawings
6 wk
Production
10 wk
Install
8 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Large rooms with original details can carry a higher rate if the furniture respects them. A ladies-floor option helps the hotel sell to women travelling alone for business, and the bar gives locals a reason to come in.

Project example 13 · Eastern Europe · Deep refurbishment of a 1970s concrete hotel

Business hotel in a 1970s block

A 140-key hotel in Eastern Europe: how we would fit it out.

Brief

A state-era hotel near the business district has the right location and the wrong rooms: narrow single beds, linoleum and no desks. The new owner wants a mid-scale business and long-stay hotel.

Mood

MotivatingCalmRoom concept: Balkan Modern

FF&E scope

Guest-room FF&E for 140 keys including kitchenette studios, cowork floor with meeting pods, grab-and-go breakfast, gym joinery.

BeforeBefore · existing condition (visualisation)
AfterAfter · Balkan Modern

Room mix · 140 keys (illustrative assumption)

LayoutShareKeys
Smart Work · 20.1 m²25%≈ 35
Smart Sleep · 20.1 m²15%≈ 21
Comfort · 30.0 m²25%≈ 35
Comfort Gaming / Youth · 30.0 m²5%≈ 7
Superior Studio Long-stay · 40.0 m²20%≈ 28
Smart Accessible · 24.8 m²10%≈ 14

Process & timeline · 44 weeks (illustrative assumption)

Survey and strip-out scope
4 wk
Concept and room mix
6 wk
Mock-up room, approval
4 wk
Production in our factory
14 wk
Install, two floors at a time
16 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Long-stay studios with a kitchenette sell well to project teams who stay for weeks. Meeting pods can be rented by the hour, and sleep rooms on the road side turn a weak position into a sellable category.

Project example 14 · Middle East · Refurbishment of an early-2000s high-end hotel

City flagship refresh

A 220-key hotel in the Middle East: how we would fit it out.

Brief

A high-end hotel with a bay view looks dated next to newer competitors: glossy dark veneer, gold satin and bulky TV cabinets. The owner wants a quieter, lighter luxury rooted in the pearl-diving heritage.

Mood

CalmPeacefulRoom concept: Doha Pearl

FF&E scope

Guest-room and suite FF&E with mother-of-pearl inlay panels, upholstered walls, mashrabiya screens, a ladies floor, lobby and rooftop furniture.

BeforeBefore · existing condition (visualisation)
AfterAfter · Doha Pearl

Room mix · 220 keys (illustrative assumption)

LayoutShareKeys
Superior · 40.0 m²25%≈ 55
Junior Suite · 50.0 m²25%≈ 55
Junior Suite Corner · 50.0 m²10%≈ 22
Suite Connecting · 60.0 m²15%≈ 33
Family Suite Connecting · 70.0 m²10%≈ 22
Signature Corner · 90.0 m²5%≈ 11
Superior Ladies Floor · 40.0 m²10%≈ 22

Process & timeline · 56 weeks (illustrative assumption)

Survey, brief with operator
6 wk
Concept and inlay samples
8 wk
Mock-up suite, approval
6 wk
Production in our factory
16 wk
Phased install by floor
20 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Connecting suites and family rooms capture large family groups who otherwise book several rooms elsewhere. A ladies floor with its own access is a clear selling point in the region, and a lighter look helps the hotel compete with new openings.

Project example 15 · Middle East · Refurbishment of a 1990s beach resort

Coastal resort repositioning

A 120-key hotel in the Middle East: how we would fit it out.

Brief

A beach resort with a fine location has faded rattan, cracked tiles and no spa. The owner wants an Omani-rooted wellness resort that works for couples and families.

Mood

PeacefulHealthyRoom concept: Muscat Frankincense

FF&E scope

Guest-room FF&E in carved timber and lime plaster finishes, bunk family rooms, spa treatment rooms, pool deck and kids club furniture.

BeforeBefore · existing condition (visualisation)
AfterAfter · Muscat Frankincense

Room mix · 120 keys (illustrative assumption)

LayoutShareKeys
Superior · 40.0 m²20%≈ 24
Superior Wellness · 40.0 m²25%≈ 30
Junior Suite · 50.0 m²20%≈ 24
Junior Suite Open Bath · 50.0 m²10%≈ 12
Family Suite · 70.0 m²15%≈ 18
Comfort Family Bunk · 30.0 m²10%≈ 12

Process & timeline · 48 weeks (illustrative assumption)

Survey and climate review
5 wk
Concept and carving samples
8 wk
Mock-up room, approval
5 wk
Production in our factory
14 wk
Install outside peak season
16 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Wellness rooms and treatments raise spend per guest per day. Family bunk rooms let a family of four book one key instead of two, and a calmer, local look helps the resort stand out from generic beach hotels.

Project example 16 · Netherlands · Conversion of a 1990s office building near the port

Office to aparthotel conversion

A 110-key hotel in the Netherlands: how we would fit it out.

Brief

An empty office building with deep floor plates and good transport links becomes an aparthotel for long and short stays. The interior has nothing worth keeping, but the floor-to-floor height on the top level allows loft units.

Mood

EnergeticMotivatingRoom concept: Rotterdam Port

FF&E scope

Studio and loft FF&E with kitchenettes, steel and oak stairs for duplex units, pet-friendly rooms, members bar and work garden, café furniture.

BeforeBefore · existing condition (visualisation)
AfterAfter · Rotterdam Port

Room mix · 110 keys (illustrative assumption)

LayoutShareKeys
Smart · 20.1 m²20%≈ 22
Comfort · 30.0 m²20%≈ 22
Comfort Pet-friendly · 30.0 m²10%≈ 11
Superior Studio Long-stay · 40.0 m²30%≈ 33
Junior Suite Loft / Duplex · 50.0 m²10%≈ 11
Smart Accessible · 24.8 m²10%≈ 11

Process & timeline · 46 weeks (illustrative assumption)

Survey and unit layouts
6 wk
Concept, steel and timber samples
6 wk
Mock-up studio, approval
4 wk
Production in our factory
14 wk
Install, floor by floor
16 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Deep office floors suit studios with kitchenettes, which long-stay guests prefer. Loft units on the top floor sell at a premium, pet-friendly rooms reach guests who are often turned away, and a members bar earns from locals.

Project example 17 · Malta · Conversion of a 1980s apartment block into a business hotel

Apartment block to business hotel

A 64-key hotel in Malta: how we would fit it out.

Brief

A family-owned apartment block becomes a business hotel for people who come to Malta to work. Rooms are long and narrow, ceilings are low, and the ground floor has to work as lobby, breakfast room and meeting space.

Mood

CalmMotivatingRoom concept: Coastal Linen

FF&E scope

Guest-room joinery with long work desks, low-profile wardrobes for low ceilings, multi-use ground floor furniture, meeting room tables and chairs.

BeforeBefore · existing condition (visualisation)
AfterAfter · Coastal Linen

Room mix · 64 keys (illustrative assumption)

LayoutShareKeys
Smart Work · 20.1 m²30%≈ 19
Comfort · 30.0 m²30%≈ 19
Comfort Work · 30.0 m²20%≈ 13
Superior · 40.0 m²15%≈ 10
Smart Accessible · 24.8 m²5%≈ 3

Process & timeline · 34 weeks (illustrative assumption)

Brief, survey, concept
4 wk
Drawings, samples
6 wk
Mock-up room
4 wk
Production in our factory
10 wk
Install floor by floor
10 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

A ground floor that works as breakfast room in the morning and meeting space in the afternoon earns twice from the same square metres. Work rooms give business guests a reason to book direct and stay longer.

Project example 18 · Germany · Conversion of a listed industrial building into a boutique hotel

Printworks boutique hotel

A 54-key hotel in Germany: how we would fit it out.

Brief

A former printworks with high ceilings and steel columns becomes a boutique hotel. The structure stays visible, so every piece of furniture has to stand free, and Bauhaus lines guide the design.

Mood

EnergeticMotivatingRoom concept: Bauhaus Grid

FF&E scope

Free-standing room joinery and wardrobes, duplex stairs and gallery furniture, steel-and-oak bar, long dining tables, library lobby.

New build / conversion: the starting point is a bare shell
Before · shell
AfterAfter · Bauhaus Grid

Room mix · 54 keys (illustrative assumption)

LayoutShareKeys
Comfort · 30.0 m²30%≈ 16
Comfort Open Bath · 30.0 m²20%≈ 11
Superior · 40.0 m²25%≈ 14
Junior Suite Loft / Duplex · 50.0 m²15%≈ 8
Suite · 60.0 m²10%≈ 5

Process & timeline · 38 weeks (illustrative assumption)

Survey, heritage constraints
6 wk
Concept, samples
6 wk
Shop drawings and approvals
8 wk
Production
10 wk
Install
8 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

High rooms with a sleeping gallery sell as a separate category. A bar and dining hall with a strong identity draw locals, which keeps the ground floor busy on weekdays and weekends.

Project example 19 · Germany · Refurbishment of a hotel that fills up during trade fairs

Trade-fair hotel refresh

A 160-key hotel in Germany: how we would fit it out.

Brief

A hotel near a trade-fair ground is full for fair weeks and quiet in between. Rooms need to sleep two colleagues well, meeting space must be flexible, and works can only happen between fairs.

Mood

MotivatingCalmRoom concept: Mid-century Warm

FF&E scope

Twin-room joinery and beds, work desks, breakfast servery for peak mornings, divisible meeting room furniture, bar furniture, gym joinery.

BeforeBefore · existing condition (visualisation)
AfterAfter · Mid-century Warm

Room mix · 160 keys (illustrative assumption)

LayoutShareKeys
Smart Twin · 20.1 m²20%≈ 32
Comfort Twin · 30.0 m²30%≈ 48
Comfort · 30.0 m²25%≈ 40
Superior Work · 40.0 m²15%≈ 24
Smart Accessible · 24.8 m²5%≈ 8
Comfort Accessible · 31.8 m²5%≈ 8

Process & timeline · 35 weeks (illustrative assumption)

Brief, room audit
3 wk
Concept, mock-up room
6 wk
Series production
12 wk
Install in batches of 20 rooms
14 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Twin rooms that feel like two private corners let the hotel sell rooms to colleagues who share. A breakfast servery planned for the peak hour keeps queues short in the weeks that earn the most.

Project example 20 · Netherlands · Conversion of a 1990s office building near a railway station

Office to long-stay studios

A 90-key hotel in the Netherlands: how we would fit it out.

Brief

An empty office building becomes long-stay studios for project workers and people between homes. Each studio needs a kitchenette, a table that works as desk and dining table, and real storage.

Mood

CalmMotivatingRoom concept: Long-stay Studio

FF&E scope

Kitchenette joinery (appliances by others), wardrobes with luggage space, fold-out tables, co-working lounge, gym joinery, grab-and-go breakfast counter.

BeforeBefore · existing condition (visualisation)
AfterAfter · Long-stay Studio

Room mix · 90 keys (illustrative assumption)

LayoutShareKeys
Comfort · 30.0 m²25%≈ 22
Superior Studio Long-stay · 40.0 m²40%≈ 36
Junior Suite · 50.0 m²20%≈ 18
Junior Suite Work · 50.0 m²10%≈ 9
Comfort Accessible · 31.8 m²5%≈ 4

Process & timeline · 36 weeks (illustrative assumption)

Survey, heritage constraints
4 wk
Concept, space planning
6 wk
Drawings, samples
6 wk
Production
10 wk
Install
10 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Studios that work for real life earn on length of stay: fewer check-ins, fewer room turns and lower cleaning cost per night. A co-working lounge gives guests a reason not to leave for a café.

Project example 21 · Netherlands · New-build city hotel for families and groups

Family city hotel

A 72-key hotel in the Netherlands: how we would fit it out.

Brief

A new city hotel for families who visit museums, zoos and events. Rooms sleep four without feeling crowded, and the public spaces are robust enough for children and still calm for adults.

Mood

JoyfulEnergeticRoom concept: Dutch Design Play

FF&E scope

Built-in bunk beds and storage, durable upholstery, connecting-room joinery, kids area furniture, breakfast room with family tables.

New build / conversion: the starting point is a bare shell
Before · shell
AfterAfter · Dutch Design Play

Room mix · 72 keys (illustrative assumption)

LayoutShareKeys
Comfort Family Bunk · 30.0 m²35%≈ 25
Superior · 40.0 m²20%≈ 14
Family Suite Connecting · 70.0 m²15%≈ 11
Comfort · 30.0 m²20%≈ 14
Comfort Accessible · 31.8 m²10%≈ 7

Process & timeline · 44 weeks (illustrative assumption)

Concept, design development
8 wk
Shop drawings, samples
8 wk
Mock-up room
4 wk
Production
12 wk
Install floor by floor
12 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Rooms for four sell at a family rate without needing large rooms. Connecting rooms let the hotel sell to groups and extended families, and a kids area keeps adults at the table a little longer.

Project example 22 · Denmark · Conversion of a brick warehouse into a city hotel

Warehouse hygge hotel

A 80-key hotel in Denmark: how we would fit it out.

Brief

A brick warehouse becomes a hotel built around hygge: warm light, wool, oak and places to sit together. Thick walls and deep windows shape every room differently.

Mood

PeacefulCalmRoom concept: Danish Hygge

FF&E scope

Room joinery made to the survey of each room, window seats, oak casegoods, library bar, breakfast tables, sauna benches.

New build / conversion: the starting point is a bare shell
Before · shell
AfterAfter · Danish Hygge

Room mix · 80 keys (illustrative assumption)

LayoutShareKeys
Comfort · 30.0 m²35%≈ 28
Comfort Corner · 30.0 m²20%≈ 16
Superior · 40.0 m²25%≈ 20
Junior Suite Corner · 50.0 m²10%≈ 8
Smart Accessible · 24.8 m²10%≈ 8

Process & timeline · 38 weeks (illustrative assumption)

Brief, survey, concept
4 wk
Drawings, samples
6 wk
Samples, mock-up room
6 wk
Production
12 wk
Install
10 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Rooms that are all a little different can be sold by character: window-seat rooms, corner rooms, rooms with a reading nook. A library bar and a small sauna give guests a reason to stay in for the evening.

Project example 23 · Denmark · New-build budget hotel with compact rooms

Sleep-first budget hotel

A 150-key hotel in Denmark: how we would fit it out.

Brief

A budget hotel where every euro goes into sleep: compact rooms, very good beds, blackout and acoustic headboards, and a ground floor that does a lot with little.

Mood

PeacefulCalmRoom concept: Deep Sleep

FF&E scope

Compact room joinery with under-bed storage, acoustic upholstered headboards, blackout pelmets, grab-and-go breakfast, multi-use lobby seating.

New build / conversion: the starting point is a bare shell
Before · shell
AfterAfter · Deep Sleep

Room mix · 150 keys (illustrative assumption)

LayoutShareKeys
Smart · 20.1 m²45%≈ 68
Smart Sleep · 20.1 m²25%≈ 38
Smart Twin · 20.1 m²20%≈ 30
Smart Accessible · 24.8 m²10%≈ 15

Process & timeline · 32 weeks (illustrative assumption)

Concept, design development
6 wk
Mock-up room
4 wk
Series production
12 wk
Install floor by floor
10 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

In a budget hotel, sleep is what guests rate. Spending on headboards, blackout and beds instead of decoration targets the score that decides bookings, and compact rooms keep the cost per key low.

Project example 24 · Eastern Europe · New-build hotel next to an airport terminal

Airport transit hotel

A 200-key hotel in Eastern Europe: how we would fit it out.

Brief

A transit hotel for early flights, late arrivals and short business trips. Guests stay one night or a few hours. Everything has to be quick: check-in, sleep, shower, coffee.

Mood

CalmEnergeticRoom concept: Quick Rest

FF&E scope

Compact room joinery, luggage benches, blackout and acoustic details, 24-hour grab-and-go counter, small meeting rooms, gym joinery.

BeforeBefore · existing condition (visualisation)
AfterAfter · Quick Rest

Room mix · 200 keys (illustrative assumption)

LayoutShareKeys
Smart · 20.1 m²40%≈ 80
Smart Work · 20.1 m²25%≈ 50
Smart Twin · 20.1 m²20%≈ 40
Smart Accessible · 24.8 m²5%≈ 10
Comfort · 30.0 m²10%≈ 20

Process & timeline · 36 weeks (illustrative assumption)

Concept, design development
6 wk
Mock-up room
4 wk
Series production
14 wk
Install floor by floor
12 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Day-use rooms can be sold more than once in 24 hours. Small meeting rooms next to the terminal earn from people who fly in for one meeting and fly out the same day.

Project example 25 · Eastern Europe · Refurbishment of a 1930s functionalist hotel

1930s functionalist hotel refresh

A 76-key hotel in Eastern Europe: how we would fit it out.

Brief

A functionalist hotel from the 1930s keeps its staircase, windows and lobby, but rooms and furniture need renewing. The new interior should respect the original lines without becoming a museum.

Mood

CalmMotivatingRoom concept: Prague Functionalism

FF&E scope

Room joinery and casegoods in a functionalist language, restored-look lobby seating, bar counter, restaurant banquettes.

BeforeBefore · existing condition (visualisation)
AfterAfter · Prague Functionalism

Room mix · 76 keys (illustrative assumption)

LayoutShareKeys
Comfort · 30.0 m²35%≈ 27
Comfort Corner · 30.0 m²20%≈ 15
Superior · 40.0 m²25%≈ 19
Junior Suite · 50.0 m²10%≈ 8
Smart Accessible · 24.8 m²10%≈ 8

Process & timeline · 42 weeks (illustrative assumption)

Survey, heritage constraints
6 wk
Concept, samples
6 wk
Shop drawings and approvals
8 wk
Production
10 wk
Phased install, 2 floors at a time
12 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

A building with a story earns its rate when the interior tells it well. Phasing two floors at a time keeps most rooms sellable, and a bar in the original lobby gives the hotel an evening offer for locals.

Project example 26 · Middle East · New-build hotel with family suites

Majlis suites hotel

A 110-key hotel in the Middle East: how we would fit it out.

Brief

A new hotel for families and long visits, with suites that have a majlis-style sitting area separate from the bedroom, and a ladies floor with its own lounge.

Mood

CalmPeacefulRoom concept: Arabian Majlis

FF&E scope

Suite joinery with majlis seating, wardrobes sized for long stays, ladies floor lounge, lobby with majlis seating groups, restaurant with private family areas.

New build / conversion: the starting point is a bare shell
Before · shell
AfterAfter · Arabian Majlis

Room mix · 110 keys (illustrative assumption)

LayoutShareKeys
Junior Suite · 50.0 m²25%≈ 28
Suite · 60.0 m²25%≈ 28
Family Suite Connecting · 70.0 m²20%≈ 22
Signature Suite · 90.0 m²15%≈ 16
Superior Ladies Floor · 40.0 m²15%≈ 16

Process & timeline · 48 weeks (illustrative assumption)

Concept, design development
8 wk
Shop drawings, samples
8 wk
Mock-up room
4 wk
Production
14 wk
Install floor by floor
14 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Suites with a separate sitting area let families receive guests without using the bedroom, which supports longer stays and higher rates. A ladies floor creates a category that some guests specifically look for.

Project example 27 · Netherlands · Conversion of an office building into long-stay lofts

Work-live loft hotel

A 120-key hotel in the Netherlands: how we would fit it out.

Brief

An office building with high floors becomes a loft hotel for people who stay for weeks: consultants, researchers and people between homes. Every loft has a raised sleeping deck, a table for four and a kitchen wall, and the top floor is a shared living room.

Mood

MotivatingCalmRoom concept: Work-Live Loft

FF&E scope

Sleeping decks with storage stairs, kitchen walls (appliances by others), four-seat tables, wardrobes with luggage space, co-working furniture for the shared top floor.

BeforeBefore · existing condition (visualisation)
AfterAfter · Work-Live Loft

More views

Kitchen wall and tableKitchen wall and table
Shared top floorShared top floor

Room mix · 120 keys (illustrative assumption)

LayoutShareKeys
Junior Suite Loft / Duplex · 50.0 m²40%≈ 48
Superior Studio Long-stay · 40.0 m²30%≈ 36
Comfort Work · 30.0 m²20%≈ 24
Comfort Accessible · 31.8 m²10%≈ 12

Process & timeline · 38 weeks (illustrative assumption)

Survey and unit layouts
4 wk
Concept, steel and timber samples
6 wk
Mock-up studio, approval
4 wk
Production in our factory
12 wk
Install floor by floor
12 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

A loft that works as office, kitchen and bedroom sells weekly and monthly rates. Long stays mean fewer room turns and lower cleaning cost, and the shared living room can sell co-working memberships to people who do not stay.

Project example 28 · Denmark · Conversion of an old brewery building into a city hotel

Brewery breakfast hotel

A 150-key hotel in Denmark: how we would fit it out.

Brief

An old brewery building becomes a city hotel where breakfast is the main event. The raw brick stays, a long breakfast hall opens to the street, and rooms are simple, warm and well made.

Mood

EnergeticJoyfulRoom concept: Brewhouse Breakfast

FF&E scope

Breakfast counters and bread wall, communal and family tables, bar furniture, room joinery with steel frames and oak, rooftop seating.

BeforeBefore · existing condition (visualisation)
AfterAfter · Brewhouse Breakfast

More views

Breakfast hallBreakfast hall

Room mix · 150 keys (illustrative assumption)

LayoutShareKeys
Comfort · 30.0 m²40%≈ 60
Comfort Twin · 30.0 m²25%≈ 38
Superior · 40.0 m²20%≈ 30
Junior Suite Corner · 50.0 m²10%≈ 15
Comfort Accessible · 31.8 m²5%≈ 8

Process & timeline · 37 weeks (illustrative assumption)

Survey, heritage constraints
5 wk
Concept, samples
6 wk
Mock-up room
4 wk
Production in our factory
12 wk
Install floor by floor
10 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

A breakfast that locals come for fills the hall even on quiet days and lifts review scores, which helps direct bookings. A free early-evening drink in the same hall keeps guests in the building for dinner.

Project example 29 · Germany · Conversion of a listed public bathhouse into a hotel

Bathhouse wellness hotel

A 70-key hotel in Germany: how we would fit it out.

Brief

A listed public bathhouse becomes a quiet hotel built around its old pool hall. The hall is restored for swimming and events, and the rooms are calm, tiled and simple so the building can speak.

Mood

CalmHealthyRoom concept: Heritage Bathhouse

FF&E scope

Room joinery made to the survey, tiled bathroom fronts, pool-hall loungers and benches, changing-room joinery, bar furniture for events.

BeforeBefore · existing condition (visualisation)
AfterAfter · Heritage Bathhouse

More views

Pool hallPool hall

Room mix · 70 keys (illustrative assumption)

LayoutShareKeys
Comfort · 30.0 m²35%≈ 24
Comfort Twin · 30.0 m²25%≈ 18
Superior Bath · 40.0 m²20%≈ 14
Junior Suite Corner · 50.0 m²10%≈ 7
Comfort Accessible · 31.8 m²10%≈ 7

Process & timeline · 36 weeks (illustrative assumption)

Survey, heritage constraints
6 wk
Concept, tile and brass samples
6 wk
Mock-up room, approval
4 wk
Production
10 wk
Install
10 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Day tickets for the pool and hire of the hall for events earn on top of the rooms. Quiet, simple rooms cost less to fit out, so the budget goes where guests notice it.

Project example 30 · Netherlands · New-build compact city hotel

Lean luxury city hotel

A 180-key hotel in the Netherlands: how we would fit it out.

Brief

A new city hotel that cuts what guests do not use and invests in what they do. No wardrobe doors, no minibar, no restaurant: instead a great bed, a big shower, good light and a bar that is open all day.

Mood

MotivatingCalmRoom concept: Lean Luxury Compact

FF&E scope

Open hanging rails, upholstered headboard walls, fold-down desks, shower partitions, bar and lounge furniture, gym joinery.

New build / conversion: the starting point is a bare shell
Before · shell
AfterAfter · Lean Luxury Compact

More views

Bar and lobbyBar and lobby

Room mix · 180 keys (illustrative assumption)

LayoutShareKeys
Smart Sleep · 20.1 m²45%≈ 81
Comfort · 30.0 m²30%≈ 54
Comfort Twin · 30.0 m²15%≈ 27
Smart Accessible · 24.8 m²10%≈ 18

Process & timeline · 34 weeks (illustrative assumption)

Concept, design development
6 wk
Mock-up room
4 wk
Series production
12 wk
Install floor by floor
12 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Fewer pieces per room means a lower cost per key and faster cleaning. The money saved buys a better bed and shower, which are what guests write about in reviews.

Project example 31 · Malta · Conversion of fortification vaults into a suite hotel

Vaulted suites in a bastion

A 21-key hotel in Malta: how we would fit it out.

Brief

Stone vaults in an old fortification become suites. The vaults are tall enough for a sleeping mezzanine over the bathroom, so each suite gains floor area without touching the stone.

Mood

PeacefulCalmRoom concept: Vaulted Bastion Suite

FF&E scope

Free-standing steel and oak mezzanines, bathroom pods below, limed oak joinery, stone-top vanities, restaurant and bar furniture.

BeforeBefore · existing condition (visualisation)
AfterAfter · Vaulted Bastion Suite

More views

Vaulted loungeVaulted lounge

Room mix · 21 keys (illustrative assumption)

LayoutShareKeys
Junior Suite Loft / Duplex · 50.0 m²50%≈ 10
Signature Corner · 90.0 m²30%≈ 6
Superior Bath · 40.0 m²20%≈ 4

Process & timeline · 34 weeks (illustrative assumption)

Survey, heritage constraints
6 wk
Concept, steel and timber samples
6 wk
Mock-up suite, approval
4 wk
Production in our factory
10 wk
Install
8 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

A mezzanine adds sellable area inside the same vault, which lifts the rate per suite. Free-standing structures avoid drilling the stone, which keeps heritage approvals simple.

Project example 32 · Malta · Conversion of a 17th-century palazzo into a suite hotel

Palazzo suite collections

A 25-key hotel in Malta: how we would fit it out.

Brief

A city palazzo becomes a suite hotel where the suites are grouped into small collections, each with its own story, colours and price. The best suites on the noble floor get a private sauna.

Mood

CalmJoyfulRoom concept: Palazzo Collections

FF&E scope

Upholstered headboard walls, velvet seating, marble vanities, private sauna joinery, restaurant and rooftop furniture.

BeforeBefore · existing condition (visualisation)
AfterAfter · Palazzo Collections

More views

Suite with private saunaSuite with private sauna

Room mix · 25 keys (illustrative assumption)

LayoutShareKeys
Junior Suite Loft / Duplex · 50.0 m²30%≈ 8
Junior Suite Open Bath · 50.0 m²30%≈ 8
Signature Wellness · 90.0 m²20%≈ 5
Superior Bath · 40.0 m²20%≈ 5

Process & timeline · 34 weeks (illustrative assumption)

Survey, heritage constraints
6 wk
Concept, colour and fabric samples
6 wk
Mock-up suite
4 wk
Production
10 wk
Install
8 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Collections let each suite type be priced on its own story, not only on size. Private saunas in the top suites create a product that few hotels in the city can offer.

Project example 33 · Germany · Conversion of a 1950s office building into studios

Kontor long-stay studios

A 65-key hotel in Germany: how we would fit it out.

Brief

A 1950s office building becomes a studio hotel that feels like a well-kept apartment from the same era. Larger studios get a kitchenette, and a shared lounge serves a simple evening snack instead of a restaurant.

Mood

CalmMotivatingRoom concept: Kontor Studio

FF&E scope

Teak and walnut veneer joinery, kitchenette fronts (appliances by others), mid-century style seating, shared lounge and breakfast counter.

BeforeBefore · existing condition (visualisation)
AfterAfter · Kontor Studio

More views

Shared loungeShared lounge

Room mix · 65 keys (illustrative assumption)

LayoutShareKeys
Comfort Work · 30.0 m²35%≈ 23
Superior Studio Long-stay · 40.0 m²35%≈ 23
Smart Work · 20.1 m²20%≈ 13
Comfort Accessible · 31.8 m²10%≈ 6

Process & timeline · 32 weeks (illustrative assumption)

Survey and unit layouts
4 wk
Concept, samples
6 wk
Mock-up studio, approval
4 wk
Production in our factory
10 wk
Install
8 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

A shared lounge with a simple evening snack costs far less than a restaurant and keeps long-stay guests coming back. Kitchenettes extend average length of stay.

Project example 34 · Denmark · New-build business hotel near a city square

Smart business hotel

A 240-key hotel in Denmark: how we would fit it out.

Brief

A business hotel with compact smart rooms and one big ground floor that works as lobby, workplace, canteen and bar. Guests check in themselves, and staff spend their time in the living room, not behind a desk.

Mood

MotivatingEnergeticRoom concept: Smart Business Room

FF&E scope

Window-wide beds with storage, pod bathroom fronts, slim desks, large shared work tables, bookshelves, canteen counter, meeting room furniture.

New build / conversion: the starting point is a bare shell
Before · shell
AfterAfter · Smart Business Room

More views

Shared living roomShared living room

Room mix · 240 keys (illustrative assumption)

LayoutShareKeys
Smart Work · 20.1 m²55%≈ 132
Smart Sleep · 20.1 m²25%≈ 60
Comfort Twin · 30.0 m²10%≈ 24
Smart Accessible · 24.8 m²10%≈ 24

Process & timeline · 42 weeks (illustrative assumption)

Concept, design development
6 wk
Mock-up room, approval
4 wk
Pilot batch of 10 rooms
4 wk
Series production
14 wk
Install floor by floor
14 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Small rooms keep the cost per key low, while the shared living room gives business guests space to work and meet. A canteen open 24 hours earns more per square metre than a formal restaurant.

Project example 35 · Middle East · New-build midscale city hotel

Midscale smart hotel

A 300-key hotel in the Middle East: how we would fit it out.

Brief

A midscale city hotel for young business travellers and families. Rooms store luggage under the bed, a self-service laundry and a games corner sit in the lobby, and a bright, robust palette keeps it cheerful.

Mood

JoyfulEnergeticRoom concept: Gulf Midscale Smart

FF&E scope

Storage beds, metal screen headboards, window bench desks, open wardrobes, communal tables, laundry and games corner furniture.

BeforeBefore · existing condition (visualisation)
AfterAfter · Gulf Midscale Smart

More views

Lobby with laundry cornerLobby with laundry corner

Room mix · 300 keys (illustrative assumption)

LayoutShareKeys
Comfort · 30.0 m²40%≈ 120
Comfort Twin · 30.0 m²25%≈ 75
Suite Connecting · 60.0 m²15%≈ 45
Smart Work · 20.1 m²10%≈ 30
Comfort Accessible · 31.8 m²10%≈ 30

Process & timeline · 38 weeks (illustrative assumption)

Concept, design development
6 wk
Mock-up room
4 wk
Series production
14 wk
Install floor by floor
14 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Under-bed storage and a laundry corner cost little and make longer stays easy, which fills the hotel outside peak weeks. Connecting rooms let families book two rooms without paying for a suite.

Project example 36 · Middle East · Restoration of traditional courtyard houses into a hotel

Courtyard house hotel

A 50-key hotel in the Middle East: how we would fit it out.

Brief

A group of traditional courtyard houses becomes a quiet heritage hotel. Rooms open to shaded courtyards, a majlis lounge serves coffee, and bathrooms are lined in warm lime plaster like a small hammam.

Mood

PeacefulCalmRoom concept: Courtyard Heritage

FF&E scope

Carved screens and niches made to survey, low majlis seating, timber beds, brass lanterns, lime-plaster bathroom fittings, spa joinery.

BeforeBefore · existing condition (visualisation)
AfterAfter · Courtyard Heritage

More views

Majlis loungeMajlis lounge
BathroomBathroom

Room mix · 50 keys (illustrative assumption)

LayoutShareKeys
Superior Bath · 40.0 m²40%≈ 20
Junior Suite Corner · 50.0 m²25%≈ 12
Signature Wellness · 90.0 m²15%≈ 8
Suite Connecting · 60.0 m²10%≈ 5
Comfort Accessible · 31.8 m²10%≈ 5

Process & timeline · 38 weeks (illustrative assumption)

Survey of three buildings
6 wk
Concept and carving samples
6 wk
Mock-up room, approval
4 wk
Production in our factory
12 wk
Install
10 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

Silence and shade are the luxury: courtyard rooms sell at a premium even without a view. A majlis lounge and a small hammam give guests reasons to stay in the hotel all day.

Project example 37 · Eastern Europe · Full refurbishment of a 19th-century grand hotel

Grand library hotel

A 110-key hotel in Eastern Europe: how we would fit it out.

Brief

A grand hotel in a historic city centre is refurbished with blackened oak, marble and a reading corner in every suite. The lobby bar becomes the city meeting place again.

Mood

CalmMotivatingRoom concept: Grand Library

FF&E scope

Panelling and fluted joinery, glass-front bookcases, marble side tables, lobby bar counter and back bar, meeting room furniture.

BeforeBefore · existing condition (visualisation)
AfterAfter · Grand Library

More views

Lobby barLobby bar

Room mix · 110 keys (illustrative assumption)

LayoutShareKeys
Superior Bath · 40.0 m²35%≈ 38
Junior Suite Work · 50.0 m²25%≈ 28
Signature Corner · 90.0 m²20%≈ 22
Suite Connecting · 60.0 m²10%≈ 11
Comfort Accessible · 31.8 m²10%≈ 11

Process & timeline · 40 weeks (illustrative assumption)

Survey and measured drawings
4 wk
Concept, samples
6 wk
Mock-up suite, approval
4 wk
Production
12 wk
Phased install by floor
14 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

A library corner in every suite is a small cost that guests remember and photograph. A lobby bar that locals use keeps the ground floor busy and earns every evening.

Project example 38 · Denmark · New-build family hotel near a leisure park

Family play fort hotel

A 140-key hotel in Denmark: how we would fit it out.

Brief

A family hotel where every room has a play fort for the children: bunks, a little door and round windows, with storage below. Parents get their own calm side of the room, and the lobby has a play lounge.

Mood

JoyfulEnergeticRoom concept: Family Play Fort

FF&E scope

Birch plywood bunk forts with storage, rounded joinery, washable upholstery, play lounge structures and tables, family breakfast tables.

New build / conversion: the starting point is a bare shell
Before · shell
AfterAfter · Family Play Fort

More views

Play loungePlay lounge

Room mix · 140 keys (illustrative assumption)

LayoutShareKeys
Comfort Family Bunk · 30.0 m²45%≈ 63
Suite Connecting · 60.0 m²20%≈ 28
Superior · 40.0 m²20%≈ 28
Comfort Accessible · 31.8 m²15%≈ 21

Process & timeline · 34 weeks (illustrative assumption)

Concept, design development
6 wk
Mock-up family suite
4 wk
Production in our factory
12 wk
Install floor by floor
12 wk

Phases overlap in practice; durations are illustrative assumptions, set per project.

Spaces

How this design earns · qualitative argument

A room that children love sells at a family rate and brings families back. Parents get a calm zone in the same room, so they do not need to book a second one.

Start with a feeling

Tell us how your guests should feel. We'll build the rest.

Put together a moodboard in a few minutes, or send us your drawings and BoQ for a quote.

Select your hotelRequest a quote