CapabilityUtrechtNetherlands

School-to-hotel conversion

A conversion fit-out for 64 keys in a former school, with timber mezzanine lofts in the classrooms.

School-to-hotel conversion, Utrecht
64 keys
24 weeks on site
70% made in our own factory
3100 m² fitted area

A capability showcase: what we can deliver for a hotel like this. It is not a completed project, and the figures are design targets, not results.

Typical brief

Turn a closed school into a hotel that keeps the classrooms and long corridors.

Building and local style

Early 1900s Dutch school: brick, tall windows, wide corridors and tiled walls.

Typical plot and building constraints

Protected corridors and tiles, five-metre rooms and no new openings in the facade.

Suggested room mix

Room typeCountSize
Mezzanine loft2838 m²
Standard double2422 m²
Superior room828 m²
Accessible room426 m²

Scope we can cover

  • Guest rooms
  • FF&E
  • Joinery
  • Bathrooms
  • Lobby
  • Restaurant and bar
  • Ceilings
  • Lighting
  • Signage and wayfinding

Suggested working model

A dedicated architect

Compare the five working models

Planned timeline by phase

Survey and brief
3
Concept and room mix
3
Shop drawings and samples
4
Mock-up room
3
Production in our own factories
7
Shipping
1
Installation and snagging
24
Handover
1

Planned weeks per phase. Phases overlap in practice; we set the real plan per project.

Planned split across our own factories

Kayseri
45%
İzmir
15%
Kocaeli
15%
Sakarya
25%
  • Kayseri Casegoods and fixed joinery
  • İzmir Upholstery frames and loose seating
  • Kocaeli Metal works and frames
  • Sakarya Veneer, doors and wall panelling

Share of the factory-made scope by site. The rest comes through Turkish suppliers we know well: fabrics, stone and solid-surface tops, glass and mirrors, and lighting.

Typical challenges and our answers

Challenge

Classrooms are five metres high and too big for one room.

Our answer

Free-standing timber mezzanines, sleeping upstairs and living below, fixed only to the floor.

Challenge

Very tall rooms echo.

Our answer

Felt panels under the mezzanine and heavy curtains.

Design targets

MetricTarget range
Average daily rate (ADR)+14% – +22%
Occupancy+4 – +8 points
Revenue per available room (RevPAR)+20% – +30%

vs. today or the local market

Target ranges we design towards, for planning only. They are not results and not promises; your revenue team sets the real numbers.

Expected effect

Each classroom becomes a loft that can sell above the standard room.

Design principles

  • Tall rooms are a gift if you add a floor.
  • Keep one classroom as it was; guests love it.

Material palette

European oakLinenBlackened steelTerrazzoAcoustic feltCork

Four expert views on the concept

Each note is written from the point of view of someone with thirty years in that role.

Hotel investor

The building offers a room category nobody else in town can sell.

General manager

Guests ask about the school. A library lounge tells the story.

Hotel operator

Stairs to a mezzanine need good light and a firm handrail at night.

Hotel architect

Nothing touches the old walls; it can all come out again.

Views and plan

School-to-hotel conversion, Utrecht
Our own render
School-to-hotel conversion, Utrecht
Top-down plan view, our own render

School-to-hotel conversion

A conversion fit-out for 64 keys in a former school, with timber mezzanine lofts in the classrooms.

Start with a feeling

Tell us how your guests should feel. We'll build the rest.

Put together a moodboard in a few minutes, or send us your drawings and BoQ for a quote.

Select your hotelRequest a quote