CapabilitySliemaMalta

Boutique hotel

A boutique fit-out for a 48-key city hotel in Malta, delivered while the hotel keeps trading.

Boutique hotel, Sliema
48 keys
16 weeks on site
70% made in our own factory
1450 m² fitted area

A capability showcase: what we can deliver for a hotel like this. It is not a completed project, and the figures are design targets, not results.

Typical brief

Turn a tired 1970s hotel into a boutique hotel without closing for a whole season.

Building and local style

A 1970s concrete frame behind a limestone front, with enclosed timber balconies typical of Sliema.

Typical plot and building constraints

A narrow plot, one small lift, no storage on site and a street where trucks can unload only early in the morning.

Suggested room mix

Room typeCountSize
Standard double3020 m²
Superior room1226 m²
Junior suite434 m²
Accessible room226 m²

Scope we can cover

  • Guest rooms
  • FF&E
  • Joinery
  • Bathrooms
  • Lobby
  • Ceilings
  • Lighting
  • Signage and wayfinding

Suggested working model

Full turnkey with installation

Compare the five working models

Planned timeline by phase

Survey and brief
2
Concept and room mix
3
Shop drawings and samples
4
Mock-up room
3
Production in our own factories
6
Shipping
2
Installation and snagging
16
Handover
1

Planned weeks per phase. Phases overlap in practice; we set the real plan per project.

Planned split across our own factories

Kayseri
40%
İzmir
25%
Kocaeli
20%
Sakarya
15%
  • Kayseri Casegoods and fixed joinery
  • İzmir Upholstery frames and loose seating
  • Kocaeli Metal works and frames
  • Sakarya Veneer, doors and wall panelling

Share of the factory-made scope by site. The rest comes through Turkish suppliers we know well: fabrics, stone and solid-surface tops, glass and mirrors, and lighting.

Typical challenges and our answers

Challenge

Rooms must change floor by floor while guests stay in the rest of the hotel.

Our answer

We pack each floor in installation order and plan quiet work around guest hours.

Challenge

Deliveries to a narrow street with a short unloading window.

Our answer

One container per floor, sequenced so it can be emptied before the morning traffic.

Design targets

MetricTarget range
Average daily rate (ADR)+10% – +18%
Occupancy+3 – +6 points
Revenue per available room (RevPAR)+15% – +25%

vs. today or the local market

Target ranges we design towards, for planning only. They are not results and not promises; your revenue team sets the real numbers.

Expected effect

New superior rooms and junior suites give the revenue team categories to price above the standard room.

Design principles

  • On an island, the container plan is part of the design.
  • A stone wall and a good tile floor carry a room further than expensive furniture.

Material palette

Local limestoneEuropean oakLinenEncaustic cement tileRattanBrushed brass

Four expert views on the concept

Each note is written from the point of view of someone with thirty years in that role.

Hotel investor

In a trading hotel, the cost of closing a floor matters as much as the cost of the furniture.

General manager

Guests notice the bed, the shower and the light first. Spend there.

Hotel operator

Salt air reaches every room. Stainless hardware and sealed edges are not optional.

Hotel architect

Let the limestone show. A good stone wall does more than a feature headboard.

Views and plan

Boutique hotel, Sliema
Our own render
Boutique hotel, Sliema
Our own render
Boutique hotel, Sliema
Our own render
Boutique hotel, Sliema
Top-down plan view, our own render

Boutique hotel

A boutique fit-out for a 48-key city hotel in Malta, delivered while the hotel keeps trading.

Start with a feeling

Tell us how your guests should feel. We'll build the rest.

Put together a moodboard in a few minutes, or send us your drawings and BoQ for a quote.

Select your hotelRequest a quote